Projects
eBay SLC03 Data Center
Project Stats
- Location
South Jordan, Utah
- Size
146,700 SF
- Data Hall
42,600 SF
- Critical Load
10.4 MW
- Market
- Expertise
Corgan worked alongside eBay on phase 2 of their SLC03 data center fit up of a data hall in an existing building. The campus includes two other buildings owned by eBay, SLC01 and SLC02. Phase 1 included the design and construction of the office and service portion of the building, as well as the build out of two data halls.